Prefab House Installation Steps 2027: From Quote to Handover

Updated: 22 November 2026 · Güven Prefabrik

In short: the process has eight steps. Most of the time is spent on the permit and production; assembly on site is the shortest part.

  1. Choose a model and any plan changes.
  2. Quote and contract with written specifications and scope.
  3. Zoning and permit (see permits).
  4. Foundation according to the soil survey (see foundations).
  5. Production in our factory in Kocaeli.
  6. Transport by truck to the plot.
  7. Assembly: frame, walls, roof, windows and doors.
  8. Installations, finishes and handover.

How long does it take?

It depends on the model, the area, the permit and how ready the site is. We give a project-specific schedule with the quote.

Frequently asked questions

What do I need to prepare?

The permit, a ready and level foundation with service outlets, truck access to the plot and a place to store the parts during assembly.

Can I live on site during assembly?

For safety, the site should be kept clear during assembly. We agree the working days with you in advance.

Who connects the utilities?

Connections to the public networks are applied for by the owner; our team prepares the in-house installations.